DAVICK VENDO 81D COKE MACHINE Restoration

Machine was delivered to me for complete restoration

Machine has been torn down and all parts sorted for restoration process

Main Body is at body shop for body work and painting

All internal parts are cleaned and either sent off for Powder coating , plating, painting or polishing.

Body and door are back from paint... dropped off main door for hand lettering.. should have back next week.

Ok all paint is back in and Powder coating back too... ASSEMBLY BEGINS TONIGHT!

Main Cabinet put back together with all new insulation, breaker strips and freshly powder coated tub!

Main door is assmbled with polished Stainless steel trim on front, new insulation, new door gasket and door liner.  Original Light assembly rewired and new bulb put in.

Main door is hung on cabinet.. ready for phase two...

Coin mech is installed as well as coin door onto main door, all new chrome parts installed.

Cooling unit is gone through, cleaned up , rewired with all new fan motors and thermostat. Finally installed into machine.

bottle stack is rebuilt and installed into machine, powder coated shelves are installed into cabinet.

nearly done!

Final Touches where added to machine and the machine has been picked up by owner.

they where very thrilled to see it completed.